Firehouse
12
New Haven, CT
Phase Two includes the addition of a musician’s hostel on top of the brick structure, a prefabricated cross-laminated timber box that was placed atop the firehouse to accommodate musicians residing in the building during recording. Place holder Place holder Place holder Place holder Place holder Place holder Place holder
The 85 seat proscenium performance space doubles as an acoustically isolated soundstage with full technical infrastructure of isolation booths and control room. A particular design challenge lay in the dual purpose of the “live room” and its conflicting acoustical requirements: for recording, the space must be acoustically dead, while for performance, the room’s reverberant character is important. Using prototypes of material and assembly systems produced in our workshop, we developed a continuous plywood shell that transforms along its surface to create opposing acoustic conditions keyed to specific areas: at the back of the proscenium stage, the plywood shell splits and distorts to act as a diffuser; above the primary recording area at the center of the room, it undulates to refract high frequency sound. From the lobby, the plywood shell forms the exterior of the auditorium, providing a kind of internal “marquee” for the theater that wraps down to create the ceiling of the basement bar.
Our client’s recent request to add bedrooms and spaces for more musicians presented a unique challenge. Lacking sufficient space in the existing building shell, the design team proposed a 650 square foot rooftop addition constructed from structural mass timber. Taking advantage of timber’s high strength to weight ratio and the possibility to fabricate large panels off-site in New Hampshire, the design team developed an innovative, prefabricated structural assembly anchored to the existing masonry building via a horizontal steel truss. Thanks to prefabrication and careful coordination, carpenters assembled the structural timber components on-site in less than 12 hours, reducing the addition’s overall construction time.
AIA New England Design Award 2017
WoodWorks Wood Design Award 2017
AIA Connecticut Design Award 2016
WoodWorks Wood Design Award 2008
AIA Connecticut Design Award 2006